two periods allowing me to model steams /diesel transition and Mid era diesels
- late 1950's -early 1960's
- late 1970's
But I do have models which are post 1980 (let alone non NSW models) but I don't intend to run those during 'operating sessions'
Layout Size
9m * 4.5m (29' * 15') approx - not as good as it seems because of the sloping attic roof
Dual level connected by a 3 turn helix with about a 1/48 grade.- Lower level is a folded dogbone giving a double track main line with two stations and staging yards either end (one set of staging yards is complete, the other is currently just a single line)
- Upper level single track with representations of Portland,Mudgee and either Gulgong or Dunedoo (this may change). The stations in between Portland and Mudgee are representing by a staging yard. I chose Portland because of the cement works (hey I work for the company - what do you expect :-) and the exchange siding workings - should be rather neat, Mudgee because of the fabulous station building let alone the fact that most trains either terminated there or at the least had an engine change, Gulgong or Dunedoo because they represent the area a little bit further up the line.
Track
- Peco code 75 flex track
- Scratchbuilt points (mainly No. 6 for the main line and No. 5 for the yard areas). Points will be controlled by scratchbuilt slow motion point motors. Rail is MicroEngineering code 70, using the rail soldered to PCB sleepers method of point construction.
Benchwork
- Lower level is 'L' girder construction using mainly 75 * 25 (3 *1) or 50 * 25 (2 *1) timber
- Upper level is a cantilevered tabletop construction, I used 75 *25 (3 * 1) maple(meranti?) as I thought it might be stronger than pine. Seems to work OK so far - it's been up for about 6 - 7 years and only 1 cantilevered support has had the glue let go, but I have had to use a threaded rod to support the upper level roughly in the middle of each section - I intend to disguise this using Ray Pilgrim's tree method.
- Benchtops are 12mm 5ply and the track is laid on 3mm cork roadbed.
Control
DCC using EasyDCC by CVP and wireless (Radio) throttles. I selected this after trying a number of different system on a few layouts as it is the one that felt most comfortable to me, it was also the only one which had a decent radio throttle at the time.
The lower level does allow for straight 'DC' control via double pole double throw switches
Track Plans
The plans show the current state of the layout, however the layout is not yet 'runnable' as I still have to make & install most of the pointmotors for the lower level - I hope to have this finalised by Feb/Mar - not sure what year though.
Took me a little while to produce the track plans as I have not used a CAD package before (I used XTrkCad), so a bit of a learning curve was involved - not perfect but good enough to see what I am trying to achieve - guess the time could have been better used in progressing the layout but I enjoyed myself while watching the cricket.
Lower Level
Upper Level